Last updated:   Monday30Oct2017 13:30 by AH
Week: 44
Maintenance this week is: Tuesday October 31st,2017
Starting at : 08:30 for 4hours 08:30 for 8 hours
More Details: After Monday's 11:00 Operations meeting
GROUP ACTIVITY Work Permit Completed
BL2C STF target transfer hot cell to nordion
Access SAB to make pressure adjustment at cooling package
Access STNF to drain holding tank
BEAMLINES Access SAB for BL4 magnets inspection
CONTROLS
HW
SW
COMPUTING
DEVELOPMENT
DIAGNOSTICS
E-LINAC
ISAC ITW -> ITE
ISIS Check H2
Regenerate cryopumps (if needed)
M & PS Further pinpoint source of 'rectifier overtemp' trips - MMPS will go OFF!
OPERATIONS SCRM and BCD tests
Drain Active Sump (if required)
Check Safety Approvals and BPRs
2A2 -> 2A3
RF RF transmission line inspection for potential leak
install spark gap @ PA3
replace HV resisitors for HVPS
RF Controls
SAFETY Sample and analyze active sump (if required)
Site SERVICES
Exp Support
Electrical
Plant Weekly routine check up and lubrications in SAB3 if possible
TARGETS
VACUUM Investigate vacuum deterioration at TK-S
R.H.
OTHER